In anticipation of the need for additional commuter parking, OZ designed this three-level project for RTD with the long-term concept of adding two additional levels, culminating in a structure that would park 500 cars. Within less than a decade, RTD found that the structure was fully utilized, so the OZ-designed 4th and 5th floors were constructed.
This precast concrete structure, located along a major highway entering the city of Boulder, is tucked into earth embankments to minimize its impact on the roadscape. Perimeter building planters soften the structure and provide a planted, terraced image. Focal points are concentrated around the pedestrian stairs and waiting area where the use of steel and glass creates a sense of transparency, user security and excitement. Bus circulation was improved by bringing in a bus lane directly off US 36.