
Flash 8 Required
Gold Hill Mesa Master Plan
Colorado Springs, COOZ Architecture developed a concept plan for this new urbanist development on 217 acres in Colorado Springs. The site is an existing gold processing mill and is classified as a reclaimed brownfield site. The concept includes a retail/mixed-use core area near the major street intersection at Highway 24, which connects downtown Colorado Springs with Old Colorado City and Manitou Springs, and S. 21st Street. Up to 1,500 housing units are planned, or under construction with a small community village located adjacent to a central park. The village includes a library, other civic uses and small neighborhood retail shops. Greenbelts connect all uses on the site to an existing regional park and open space south of the site.