Flash 8 Required
Manhattan Middle School Remodel & Addition
Boulder, COManhattan Middle School of Arts and Academics was born out of the merger of the existing “Burbank Middle School” and the relocated “School of the Arts” program. The merge created a unique opportunity for a new image and identity to go along with the school’s exciting new programs. The result was two additions and an extensive remodel. The new 2,811 SF Entry and Administrative Addition is located strategically, enabling improved security by creating a closed campus with a secure outdoor courtyard and a focused entrance. Indoor circulation was also improved by enclosing an existing exterior walkway. The new 9,949 SF Music and Science addition creates a “state of the art” facility for both these reputable programs. Sustainability and green building practices are showcased throughout the project with day lighting, natural ventilation, exposed concrete floors and roof structure, low VOC paints, an outside teaching courtyard, and a monitored 10kw photovoltaic system on the roof with small wind turbines. The district was able to leverage their budget to maximize current operations while positioning themselves competitively for future academic flexibility.
PROJECT TEAM
Kate Fields - Project ManagerKelly Yamasaki - Principal In Charge
