Flash 8 Required

West Metro Fire Stations No.4 and 8

Denver,

West Metro Fire Station 4 replaces an existing station on the same site and serves the Green Mountain area of Lakewood. The station houses three apparatus bays, ten bunks and two slide poles. Station 4 is meticulously detailed and places all the occupants directly adjacent to the bays to increase turn-out time. It also incorporates a roof patio to take advantage of the stunning downtown views from the station. Area: 10,500sf, Project Manager: Mike Whitley, AIA LEED AP

West Metro Fire Station 8 replaces an existing station on the adjacent lot. Station 8 is comprised of three bays and ten bunks. The constricted site and challenging grade made Station 8 quite unique but still highly efficient. OZ worked closely with West Metro to establish a character for the fire station that is both historic and modern in its aesthetic. The design is influenced by the retail neighborhood in which the Station is situated. The desire for uniformity of design is achieved while still maintaining contextual suitability and responsible civic design,creating an interesting and vibrant backdrop to the neighborhood.
Area: 10,500sf, Project Manager: Mike Whitley, AIA LEED AP

PROJECT TEAM

Bob West - Principal In Charge

SERVICES PROVIDED

Architecture
Interior Design
Three Dimensional Rendering & Graphic Design